GB713 12Cr1MoVR Pressure Vessel Steel Plate

GB713 12Cr1MoVR Pressure Vessel Steel Plate

FOB Reference Price:Get Latest Price

Offer Ability:5 000MT/Per Month GB713 12Cr1MoVR Pressure Vessel Steel Plate

  • Loading Port: Shanghai Tianjin Qingdao.
  • Delivery Time: 30-50 days 7 days for stock goods
  • Contact usOnline order

Product Description

Specifications:
Thickness: 3mm-150mm         
Width: 1220mm-4200mm
Length: 5000mm-18000mm

12Cr1MoVR is one kind boiler steel grade in steel standard GB 713 which is used for specified elevated boilers and pressure vessels.

GB713 12Cr1MoVR steel Chemical Composition (%):

Grade

Chemical Composition (%)

C

Mn

Si

P

S

Cr

Mo

12Cr1MoVR

0.08-0.15

0.4-0.7

0.15-0.4

≤0.025

≤0.01

0.9-1.2

0.25-0.35

GB713 12Cr1MoVR steel Mechanical Property:

Thickness mm

Mechanical Property

Tensile Strength (MPa)

Yield Strength (MPa)

Elongation after fracture % min.

Impact energy min. at a temperature in 20 ℃

6-60

440-590

245

19

34

60-100

430-580

235

Application:
Main application of GB 713 12Cr1MoVR are used to build boilers and pressure vessels such as petroleum, chemical industry, power plants.

BBN Steel is specializing in GB713 12Cr1MoVR Pressure Vessel Steel Plate which is under GB/T specification.GB713 12Cr1MoVR Pressure Vessel Steel Plate has excellent mechanical properties and widely application. Combining above advantages can be supplied the most in line with customer requirements products. Moreover,we will provide cutting, pretreatment, galvanizing, testing, heat treatment services for GB713 12Cr1MoVR Pressure Vessel Steel Plate.If you want to known GB713 12Cr1MoVR Pressure Vessel Steel Plate more information,welcome to contact with us at any time: bb@bebonchina.com.

BBN Service

1.Additional Condition: UT(Ultrasonic examination), AR(As Hot Rolled only), TMCP(Thermal Mechanical Control Processing), N(Normalized), Q+T(Quenched and Tempered),Z Direction Test(Z15,Z25,Z35), Charpy V-Notch Impact Test, The Third Party Test (such as SGS Test), Coated or Shot Blasting and Painting.

2.Shipping department: a).Book shipping space b).Documents confirmation c).Shipping track d).Shipping case

3.Production control department: a).Technical evaluation b).Production Schedule c).Production Tracking d).Successfully complaint case

4.Quality control: a).Test in mill b).Inspection before Shipment c).Third Party Inspection d).About Package problem e).Quality problem case

5.Customers’ feedback and complaint: a).Quality feedback b).Service feedback c).Complaint d).Case